Cost Reduction & Program Management

Cost Reduction & Program Management

Ricardo was asked to generate cost reduction ideas for 3 engines and 2 transmissions to assist client in expanding new design concepts: 3 engines at various levels of maturity in their design lives, 2 transmissions (1 mature and 1 newer), global volumes ranging from 100k to 550k per year, scope included engines / transmission components (direct material) purchased by the powertrain plants.

Latest Resources

New product launch assessment that identified specific and systemic risks with corrective action plan for production launch

New product launch assessment that identified specific and systemic risks with corrective action plan for production launch

Case study
Download resource
Analysis showed that OEM’s delivered market driven upgrades while delivering improved safety required to meet FMVSS 301R

Analysis showed that OEM’s delivered market driven upgrades while delivering improved safety required to meet FMVSS 301R

Case study
Download resource
Assessed major radar suppliers for active safety features and developped technology roadmaps

Assessed major radar suppliers for active safety features and developped technology roadmaps

Case study
Download resource